Project Location: Habshan, Abu Dhabi, United Arab Emirates
Project Worth: US $4.7 Billion
Status: Completed (Oil & gas processing and separation plant)
Scope of Supply: Supply of Stud Bolts (A193 B7/B7M/A320 L7/L7M/A193 B8 CL2/B8m CL2)(PTFE Coated), Hex Bolts, Anchor Bolts, U Bolts and Clamps